A lightweight renovation addressing congested aisles, aging shelving and high refrigeration energy use in an operating store.
Store renovationSpace-efficiency improvementEnergy-efficient refrigeration
Generate and download this case study directly in your browser.
Supermarket Turnkey Projects980 m² / Store upgrade
Project analysis
Project Challenges & Implementation Solution
Project Challenges
The store had to remain open during renovation, leaving a limited construction window while the existing merchandising capacity for core categories still had to be maintained.
Implementation Solution
Shelving was replaced during night work periods, while refrigerated cases were upgraded in batches. High-frequency products and the checkout path were reorganized to minimize disruption to daily operations.
01Basic store operations maintained during renovation
02Improved aisle width and corner circulation
03More efficient refrigeration energy configuration
04Merchandising levels better suited to community shopping